June 9-10, 2009; TG Tutorial Planning Meeting (VU)
Jump to navigation
Jump to search
Slides still needed
- Security scheme --
- Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads
- Future
Items needed on-site/available
- Version of LoDN Download client that can use LoRS if installed
- Hand outs for participants
- Slides (2 per page, front and back)
- Instruction sheets for steps in the Hands on phase
Documents
- Current schedule for tutorial
- Current version of the slides