Feb 29, 2008
Bi-Monthly Collaboration Meeting
Coordinates
- Feb 29, 2008 -- 11:00ET/10:00CT/8:00PT
- Call 510-665-5437
- Meeting ID is 7333
Attending
- Santi, Alan, Larry, Bobby (Vanderbilt ACCRE)
- Paul and Dan (Vanderbilt)
- PR and Diane (SFASU)
- John Cobb (ORNL)
- Hunter (Nevoa)
- Terry and Chris (UTK)
Agenda
Status Report on Production REDDnet Deployment
AmericaView Status
they are routing over I1 and not I2. so that is one particular problem with download speeds. investigations going on at SFASU.
timeout issue with metadata server... but timeouts are at Vanderbilt... traceroute timing out at Vanderbilt? could be Vanderbilt doing "traffic shaping"
they will keep us posted.
everything is uploaded to default LUN. its there and coming down fine. (modulo the network issues).
they will consider augment to SFASU for persistent copy and then augment to default which will spread out to everyone for use.
LODN Status
new depot code required. should now work with both warmer and LODN code. but this exposed another issue with storecore and so new depot code will not be distributed until then. Nevoa is looking into this and after that is working ACCRE will roll out depot to rest of REDDnet.
UTK will try to install local depot so they can do testing. Alan has to package it up a bit better first.
And Chris has fixed a problem locally at UTK (not with LODN code but a campus problem) that was also causing trouble.
everything works fine now (LODN and warmer) on test depots at Vanderbilt so optimistic will work fine on production depots.