July 16, 2008

From ReddNet
Revision as of 08:09, 16 July 2008 by Sheldonp (talk | contribs)
Jump to navigation Jump to search

REDDnet Collaboration Meeting

Coordinates

  • July 16, 2008 -- 11:00ET/10:00CT/8:00PT
  • Call 510-665-5437
  • Meeting ID is 7333

Attending???

  • Santi, Alan, Matt (Vanderbilt ACCRE)
  • Dan (from CERN, Vanderbilt Physics)
  • Diana and PR (SFASU)
  • Micah, Terry, Harrold and Chris (UTK)
  • John (ORNL)
  • Paul (from Fermilab, Vanderbilt Physics)

Agenda

Heavy on Library of Congress Issues today, preparing or phone call with them tomorrow.

  • Status of FACIT-Globetrotter work (Santi, Chris)
    • Description of whats to be done - Globtrotter/REDDnet integration
    • where are we on getting this done?
    • Phone call tomorrow with LoC, others
  • Status of TVNA work
    • "l-sync" tool status (Matt)
    • What would LoC have to do to get this going?
  • Status of FACIT transfers
    • "VM Depot" status - for LoC Depot (Bobby, Matt)
    • have we found out about their depot requirements? (Bobby, Mat)
    • Can they use "l-sync"?
    • what do we want to ask tomorrow about these? (compile list of questions)
  • Status of work at SFASU (PR, Diane)
  • Status of CERN depots
    • Hardware procurement status
    • best guess on when it will be ready to ship
    • hosting, power, etc., arrangements with CERN
    • installation plans
    • shipping plans
  • Status of CMS work
    • Crab/REDDnet integration
    • setting up REDDnet as a Storage Element (SE) for CMS - whats required, what we plan to do
    • Once integration complete, plans for "unintentional" use by CMS
      • they routinely submit jobs
      • jobs will run and use REDDnet without user even knowing or requesting
      • once this happens we can tout to CMS software gurus
    • Plans for intentional use at Caltech, other places?
    • root plugin plans (get it distributed with standard root distribution)
  • Terascale Super Nova Status
  • Status of ORNL depots (Bobby, John)
  • PerfSONAR integration status (Bobby, Martin)
  • Evaluation of Jian's visualization stuff (Micah)
  • What does Dan need to test NFU version of CMS software?