June 9-10, 2009; TG Tutorial Planning Meeting (VU): Difference between revisions
Jump to navigation
Jump to search
(New page: == Slides still needed == * Security scheme -- ** Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads ** Future == Items needed on-site/available == * Version ...) |
No edit summary |
||
Line 1: | Line 1: | ||
== Slides still needed == | == Slides still needed == | ||
# Security scheme -- | |||
## Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads | |||
## Future | |||
== Items needed on-site/available == | == Items needed on-site/available == | ||
# Version of LoDN Download client that can use LoRS if installed | |||
# Hand outs for participants | |||
## Slides (2 per page, front and back) | |||
## Instruction sheets for steps in the Hands on phase | |||
== Documents == | == Documents == | ||
# Current schedule for tutorial | |||
# Current version of the slides |
Revision as of 08:42, 12 June 2009
Slides still needed
- Security scheme --
- Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads
- Future
Items needed on-site/available
- Version of LoDN Download client that can use LoRS if installed
- Hand outs for participants
- Slides (2 per page, front and back)
- Instruction sheets for steps in the Hands on phase
Documents
- Current schedule for tutorial
- Current version of the slides