August 15, 2008: Difference between revisions
Jump to navigation
Jump to search
(New page: =REDDnet Collaboration Meeting= ==Coordinates== * August 15, 2008 -- 11:00ET/10:00CT/8:00PT * Call 510-665-5437 * Meeting ID is 7333 ==Attending (???) == * Bobby, Dan, Matt and Santi (...) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
* Meeting ID is 7333 | * Meeting ID is 7333 | ||
==Attending | ==Attending == | ||
* Bobby, | * Bobby, Matt, Paul and Santi (Vanderbilt ACCRE) | ||
* Diana (SFASU) | * Diana and PR (SFASU) | ||
* Chris, Gerrald | * Chris, Gerrald, Micah and Terry (UTK) | ||
* Dan (Vanderbilt Physics) | |||
* Dan | |||
==Agenda == | ==Agenda == | ||
Line 18: | Line 16: | ||
* Status reports | * Status reports | ||
** UTK depots (Gerrald) | ** UTK depots (Gerrald) | ||
*** short term interest in deploying IBP based SEs for OSG... | |||
*** high capacity link to Fermilab will unfortunately not be useful for REDDnet because its a point-to-point | |||
*** would like to deploy a REDDnet based SE, but right now they are deploying a dcache based SE (physics cluster) | |||
*** have a campus cluster as well, freeing up some space there, they will be a part of UT network. | |||
*** Micah has funding for standard REDDnet depots. | |||
*** same amount at NCState | |||
** CMS and REDDnet (Dan, Chris) | ** CMS and REDDnet (Dan, Chris) | ||
*** Next week at CERN, Dan will work with Lassi Turi on fixing the CMSSW interface that has been broken in the most recent release of CMSSW. | |||
*** hope very soon to get started with an initial test group of three CMS users to try out using REDDnet as a SE for their work. | |||
** Status of FACIT-Globetrotter work (Santi, Chris) | ** Status of FACIT-Globetrotter work (Santi, Chris) | ||
*** hidden file was cause of compile problem UCSB was having (we believe) | |||
*** corrupted argument problem in Javaws can be fixed and Santi will do that | |||
*** Chris will repackage all of this and make sure it will work when UCSB goes to install it. | |||
** Status of depots (Bobby) | ** Status of depots (Bobby) | ||
*** Fixing the | *** Fixing the bad SDSC depot | ||
*** Any fall-out from the depot upgrade? (and simultaneous l-server upgrade)? | *** Any fall-out from the depot upgrade? (and simultaneous l-server upgrade)? | ||
Latest revision as of 09:55, 15 August 2008
REDDnet Collaboration Meeting
Coordinates
- August 15, 2008 -- 11:00ET/10:00CT/8:00PT
- Call 510-665-5437
- Meeting ID is 7333
Attending
- Bobby, Matt, Paul and Santi (Vanderbilt ACCRE)
- Diana and PR (SFASU)
- Chris, Gerrald, Micah and Terry (UTK)
- Dan (Vanderbilt Physics)
Agenda
- Status reports
- UTK depots (Gerrald)
- short term interest in deploying IBP based SEs for OSG...
- high capacity link to Fermilab will unfortunately not be useful for REDDnet because its a point-to-point
- would like to deploy a REDDnet based SE, but right now they are deploying a dcache based SE (physics cluster)
- have a campus cluster as well, freeing up some space there, they will be a part of UT network.
- Micah has funding for standard REDDnet depots.
- same amount at NCState
- CMS and REDDnet (Dan, Chris)
- Next week at CERN, Dan will work with Lassi Turi on fixing the CMSSW interface that has been broken in the most recent release of CMSSW.
- hope very soon to get started with an initial test group of three CMS users to try out using REDDnet as a SE for their work.
- Status of FACIT-Globetrotter work (Santi, Chris)
- hidden file was cause of compile problem UCSB was having (we believe)
- corrupted argument problem in Javaws can be fixed and Santi will do that
- Chris will repackage all of this and make sure it will work when UCSB goes to install it.
- Status of depots (Bobby)
- Fixing the bad SDSC depot
- Any fall-out from the depot upgrade? (and simultaneous l-server upgrade)?
- UTK depots (Gerrald)
- Brief Status reports
- Status of TVNA work
- VM Depot Status (Bobby)
- Are we still on target for Monday?
- Status of work at SFASU (Diane)
- Status of ORNL depots (Bobby, Jim)
- did Lun for Jim get created?
- PerfSONAR integration status (Bobby, Martin)
- UTK tests
- Terscale Supernova Project (Terry)
- Status of CERN depots
- nothing to say here, Dan and Paul will know more when they get there next week.