August 15, 2008: Difference between revisions
Jump to navigation
Jump to search
(→Agenda) |
|||
Line 18: | Line 18: | ||
* Status reports | * Status reports | ||
** UTK depots (Gerrald) | ** UTK depots (Gerrald) | ||
*** short term interest in deploying IBP based SEs for OSG... | |||
*** high capacity link to Fermilab will unfortunately not be useful for REDDnet because its a point-to-point | |||
*** would like to deploy a REDDnet based SE, but right now they are deploying a dcache based SE (physics cluster) | |||
*** have a campus cluster as well, freeing up some space there, they will be a part of UT network. | |||
*** Micah has funding for standard REDDnet depots. | |||
*** same amount at NCState | |||
** CMS and REDDnet (Dan, Chris) | ** CMS and REDDnet (Dan, Chris) | ||
** Status of FACIT-Globetrotter work (Santi, Chris) | ** Status of FACIT-Globetrotter work (Santi, Chris) |
Revision as of 09:20, 15 August 2008
REDDnet Collaboration Meeting
Coordinates
- August 15, 2008 -- 11:00ET/10:00CT/8:00PT
- Call 510-665-5437
- Meeting ID is 7333
Attending (???)
- Bobby, Matt, Paul and Santi (Vanderbilt ACCRE)
- Diana and PR (SFASU)
- Chris, Gerrald, Micah and Terry (UTK)
- Hunter (Nevoa)
- Jim and John (ORNL)
- Dan (Vanderbilt Physics)
Agenda
- Status reports
- UTK depots (Gerrald)
- short term interest in deploying IBP based SEs for OSG...
- high capacity link to Fermilab will unfortunately not be useful for REDDnet because its a point-to-point
- would like to deploy a REDDnet based SE, but right now they are deploying a dcache based SE (physics cluster)
- have a campus cluster as well, freeing up some space there, they will be a part of UT network.
- Micah has funding for standard REDDnet depots.
- same amount at NCState
- CMS and REDDnet (Dan, Chris)
- Status of FACIT-Globetrotter work (Santi, Chris)
- Status of depots (Bobby)
- Fixing the bas SDSC depot
- Any fall-out from the depot upgrade? (and simultaneous l-server upgrade)?
- UTK depots (Gerrald)
- Brief Status reports
- Status of TVNA work
- VM Depot Status (Bobby)
- Are we still on target for Monday?
- Status of work at SFASU (Diane)
- Status of ORNL depots (Bobby, Jim)
- did Lun for Jim get created?
- PerfSONAR integration status (Bobby, Martin)
- UTK tests
- Terscale Supernova Project (Terry)
- Status of CERN depots
- nothing to say here, Dan and Paul will know more when they get there next week.