July 16, 2008: Difference between revisions
Jump to navigation
Jump to search
(→Agenda) |
|||
Line 20: | Line 20: | ||
* Status of FACIT-Globetrotter work (Santi, Chris) | * Status of FACIT-Globetrotter work (Santi, Chris) | ||
** Description of whats to be done - Globtrotter/REDDnet integration | ** Description of whats to be done - Globtrotter/REDDnet integration | ||
*** very similar to what Glovis is doing... | |||
*** Webstart app for LODN requires certificate - Santi is getting | |||
*** Chris will incorporate into their cvs to others (such as PR) can get it | |||
** where are we on getting this done? | ** where are we on getting this done? | ||
** Phone call tomorrow with LoC, others | ** Phone call tomorrow with LoC, others |
Revision as of 09:18, 16 July 2008
REDDnet Collaboration Meeting
Coordinates
- July 16, 2008 -- 11:00ET/10:00CT/8:00PT
- Call 510-665-5437
- Meeting ID is 7333
Attending???
- Santi, Alan, Matt (Vanderbilt ACCRE)
- Diana and PR (SFASU)
- Micah, Terry, Harrold??? and Chris??? (UTK)
- ???John (ORNL)
- Hunter (Nevoa)
- Dan and Paul (from Fermilab, Vanderbilt Physics)
Agenda
Heavy on Library of Congress Issues today, preparing or phone call with them tomorrow.
- Status of FACIT-Globetrotter work (Santi, Chris)
- Description of whats to be done - Globtrotter/REDDnet integration
- very similar to what Glovis is doing...
- Webstart app for LODN requires certificate - Santi is getting
- Chris will incorporate into their cvs to others (such as PR) can get it
- where are we on getting this done?
- Phone call tomorrow with LoC, others
- Description of whats to be done - Globtrotter/REDDnet integration
- Status of TVNA work
- "l-sync" tool status (Matt)
- What would LoC have to do to get this going?
- Status of FACIT transfers
- "VM Depot" status - for LoC Depot (Bobby, Matt)
- have we found out about their depot requirements? (Bobby, Mat)
- Can they use "l-sync"?
- what do we want to ask tomorrow about these? (compile list of questions)
- Status of work at SFASU (PR, Diane)
- Status of CERN depots
- Hardware procurement status
- best guess on when it will be ready to ship
- hosting, power, etc., arrangements with CERN
- installation plans
- shipping plans
- Status of CMS work
- Crab/REDDnet integration
- setting up REDDnet as a Storage Element (SE) for CMS - whats required, what we plan to do
- Once integration complete, plans for "unintentional" use by CMS
- they routinely submit jobs
- jobs will run and use REDDnet without user even knowing or requesting
- once this happens we can tout to CMS software gurus
- Plans for intentional use at Caltech, other places?
- root plugin plans (get it distributed with standard root distribution)
- Terascale Super Nova Status
- Status of ORNL depots (Bobby, John)
- PerfSONAR integration status (Bobby, Martin)
- Evaluation of Jian's visualization stuff (Micah)
- What does Dan need to test NFU version of CMS software?