July 16, 2008: Difference between revisions

From ReddNet
Jump to navigation Jump to search
No edit summary
Line 16: Line 16:
==Agenda ==
==Agenda ==


This is currently just copied from our last meeting.  will be updated soon...
Heavy on Library of Congress Issues today, preparing or phone call with them tomorrow.


* Status of Depot Monitoring Tools (Bobby)
* Status of FACIT-Globetrotter work (Santi, Chris)
** [http://monitor.reddnet.org/status.html New REDDnet Status Page] - work in progress!
** Description of whats to be done - Globtrotter/REDDnet integration
** where are we on getting this done? 
** Phone call tomorrow with LoC, others


* Password protected page for cell phone numbers and skype addresses. (Mat)
* Status of TVNA work
** "l-sync" tool status (Matt)
** What would LoC have to do to get this going?


* Need to make a todo list for Library of Congress Work (Terry)
* Status of FACIT transfers
** we need a list to give to LoC so they know what they should be doing.
** "VM Depot" status - for LoC Depot  (Bobby, Matt)
** have we found out about their depot requirements?  (Bobby, Mat)
** Can they use "l-sync"?
** what do we want to ask tomorrow about these? (compile list of questions)


* SFASU tests (PR)
* Status of work at SFASU (PR, Diane)
** recursive uploads of 13,000 files in 82 subdirectories, about 2MB files, 25.6 GB total.
** 2-8 MB/s speeds
** using l-store client
** Santi points out that a new version of the client that can do some parallel uploads will be available very soon.  They are using now but still working out a few bottlenecks.
** recursives ran perfectly
** they have a much large data set than this that they will start pushing soon.


* ORNL Depots (Bobby, John)
* Status of CERN depots
** new goal: 4th week of June is the new window
** Hardware procurement status
** best guess on when it will be ready to ship
** hosting, power, etc., arrangements with CERN
** installation plans
** shipping plans


* Status of CMS integration work (Dan)
* Status of CMS work
** Crab/REDDnet integration
** setting up REDDnet as a Storage Element (SE) for CMS - whats required, what we plan to do
** Once integration complete, plans for "unintentional" use by CMS
*** they routinely submit jobs
*** jobs will run and use REDDnet without user even knowing or requesting
*** once this happens we can tout to CMS software gurus
** Plans for intentional use at Caltech, other places?
** root plugin plans (get it distributed with standard root distribution)


* PerfSONAR integration Status (Bobby, Martin)
* Terascale Super Nova Status
** Demo opportunity for SC08?


* Nodes for CERN (Bobby, Martin)
* Status of ORNL depots (Bobby, John)


* Phoebus / Logistical Networking Integration issues (Terry, Martin)
* PerfSONAR integration status (Bobby, Martin)
** use GridFTP and use Dan's plugin?


* Terascale Super Nova status
* Evaluation of Jian's visualization stuff (Micah)
 
* What does Dan need to test NFU version of CMS software?

Revision as of 08:09, 16 July 2008

REDDnet Collaboration Meeting

Coordinates

  • July 16, 2008 -- 11:00ET/10:00CT/8:00PT
  • Call 510-665-5437
  • Meeting ID is 7333

Attending???

  • Santi, Alan, Matt (Vanderbilt ACCRE)
  • Dan (from CERN, Vanderbilt Physics)
  • Diana and PR (SFASU)
  • Micah, Terry, Harrold and Chris (UTK)
  • John (ORNL)
  • Paul (from Fermilab, Vanderbilt Physics)

Agenda

Heavy on Library of Congress Issues today, preparing or phone call with them tomorrow.

  • Status of FACIT-Globetrotter work (Santi, Chris)
    • Description of whats to be done - Globtrotter/REDDnet integration
    • where are we on getting this done?
    • Phone call tomorrow with LoC, others
  • Status of TVNA work
    • "l-sync" tool status (Matt)
    • What would LoC have to do to get this going?
  • Status of FACIT transfers
    • "VM Depot" status - for LoC Depot (Bobby, Matt)
    • have we found out about their depot requirements? (Bobby, Mat)
    • Can they use "l-sync"?
    • what do we want to ask tomorrow about these? (compile list of questions)
  • Status of work at SFASU (PR, Diane)
  • Status of CERN depots
    • Hardware procurement status
    • best guess on when it will be ready to ship
    • hosting, power, etc., arrangements with CERN
    • installation plans
    • shipping plans
  • Status of CMS work
    • Crab/REDDnet integration
    • setting up REDDnet as a Storage Element (SE) for CMS - whats required, what we plan to do
    • Once integration complete, plans for "unintentional" use by CMS
      • they routinely submit jobs
      • jobs will run and use REDDnet without user even knowing or requesting
      • once this happens we can tout to CMS software gurus
    • Plans for intentional use at Caltech, other places?
    • root plugin plans (get it distributed with standard root distribution)
  • Terascale Super Nova Status
  • Status of ORNL depots (Bobby, John)
  • PerfSONAR integration status (Bobby, Martin)
  • Evaluation of Jian's visualization stuff (Micah)
  • What does Dan need to test NFU version of CMS software?