July 16, 2008: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 16: | Line 16: | ||
==Agenda == | ==Agenda == | ||
Heavy on Library of Congress Issues today, preparing or phone call with them tomorrow. | |||
* Status of | * Status of FACIT-Globetrotter work (Santi, Chris) | ||
** | ** Description of whats to be done - Globtrotter/REDDnet integration | ||
** where are we on getting this done? | |||
** Phone call tomorrow with LoC, others | |||
* | * Status of TVNA work | ||
** "l-sync" tool status (Matt) | |||
** What would LoC have to do to get this going? | |||
* | * Status of FACIT transfers | ||
** we | ** "VM Depot" status - for LoC Depot (Bobby, Matt) | ||
** have we found out about their depot requirements? (Bobby, Mat) | |||
** Can they use "l-sync"? | |||
** what do we want to ask tomorrow about these? (compile list of questions) | |||
* SFASU | * Status of work at SFASU (PR, Diane) | ||
* | * Status of CERN depots | ||
** | ** Hardware procurement status | ||
** best guess on when it will be ready to ship | |||
** hosting, power, etc., arrangements with CERN | |||
** installation plans | |||
** shipping plans | |||
* Status of CMS integration | * Status of CMS work | ||
** Crab/REDDnet integration | |||
** setting up REDDnet as a Storage Element (SE) for CMS - whats required, what we plan to do | |||
** Once integration complete, plans for "unintentional" use by CMS | |||
*** they routinely submit jobs | |||
*** jobs will run and use REDDnet without user even knowing or requesting | |||
*** once this happens we can tout to CMS software gurus | |||
** Plans for intentional use at Caltech, other places? | |||
** root plugin plans (get it distributed with standard root distribution) | |||
* | * Terascale Super Nova Status | ||
* | * Status of ORNL depots (Bobby, John) | ||
* | * PerfSONAR integration status (Bobby, Martin) | ||
* | * Evaluation of Jian's visualization stuff (Micah) | ||
* What does Dan need to test NFU version of CMS software? |
Revision as of 08:09, 16 July 2008
REDDnet Collaboration Meeting
Coordinates
- July 16, 2008 -- 11:00ET/10:00CT/8:00PT
- Call 510-665-5437
- Meeting ID is 7333
Attending???
- Santi, Alan, Matt (Vanderbilt ACCRE)
- Dan (from CERN, Vanderbilt Physics)
- Diana and PR (SFASU)
- Micah, Terry, Harrold and Chris (UTK)
- John (ORNL)
- Paul (from Fermilab, Vanderbilt Physics)
Agenda
Heavy on Library of Congress Issues today, preparing or phone call with them tomorrow.
- Status of FACIT-Globetrotter work (Santi, Chris)
- Description of whats to be done - Globtrotter/REDDnet integration
- where are we on getting this done?
- Phone call tomorrow with LoC, others
- Status of TVNA work
- "l-sync" tool status (Matt)
- What would LoC have to do to get this going?
- Status of FACIT transfers
- "VM Depot" status - for LoC Depot (Bobby, Matt)
- have we found out about their depot requirements? (Bobby, Mat)
- Can they use "l-sync"?
- what do we want to ask tomorrow about these? (compile list of questions)
- Status of work at SFASU (PR, Diane)
- Status of CERN depots
- Hardware procurement status
- best guess on when it will be ready to ship
- hosting, power, etc., arrangements with CERN
- installation plans
- shipping plans
- Status of CMS work
- Crab/REDDnet integration
- setting up REDDnet as a Storage Element (SE) for CMS - whats required, what we plan to do
- Once integration complete, plans for "unintentional" use by CMS
- they routinely submit jobs
- jobs will run and use REDDnet without user even knowing or requesting
- once this happens we can tout to CMS software gurus
- Plans for intentional use at Caltech, other places?
- root plugin plans (get it distributed with standard root distribution)
- Terascale Super Nova Status
- Status of ORNL depots (Bobby, John)
- PerfSONAR integration status (Bobby, Martin)
- Evaluation of Jian's visualization stuff (Micah)
- What does Dan need to test NFU version of CMS software?