Tests: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 18: | Line 18: | ||
These tests are continuous, although they can be stopped (just ask me). | These tests are continuous, although they can be stopped (just ask me). | ||
[[http://www.hep.vanderbilt.edu/~sheldonp/budplots.html | [[http://www.hep.vanderbilt.edu/~sheldonp/budplots.html Results]] are updated hourly. |
Revision as of 14:51, 28 April 2008
Test Documentation
- For each test:
- description of what you are testing
- estimate duration, estimate what you expect?
- description for your test method (what you did)
- result
Proposed Tests
- Stress test on SFASU
- What happens when depots start to get full? (Harold and Dan)
- depots should do low-level reclamation/resource recovery - Dan and Alan will do this test later this week
Ongoing Usage Tests (Sheldon)
These tests are continuous, although they can be stopped (just ask me).
[Results] are updated hourly.