=== Deployment === | === Deployment === | ||
* Bring current deployment up-to-date (estimate complete by mid-Feb) | * '''Bring current deployment up-to-date (estimate complete by mid-Feb)''' | ||
** Build new image for 2GB internal USB memory | ** Build new image for 2GB internal USB memory | ||
*** may be done by All-Hands | *** may be done by All-Hands | ||
Line 15: | Line 15: | ||
*** needs a day or two of time, could be done now depending on priority | *** needs a day or two of time, could be done now depending on priority | ||
* Prepare additional existing hardware for deployment (19 nodes) | * '''Prepare additional existing hardware for deployment (19 nodes)''' | ||
** Update image on internal USB (will use for testing of the above recovery process) | ** Update image on internal USB (will use for testing of the above recovery process) | ||
** Send 6 depots to SFASU with additional PDU | ** Send 6 depots to SFASU with additional PDU | ||
Line 37: | Line 37: | ||
** review deployment experience end of March | ** review deployment experience end of March | ||
* Proposed multi-tiered system for sites for discussion | * '''Proposed multi-tiered system for sites for discussion''' | ||
** Tier 1: Sites that run their own LServer and Chord ring | ** Tier 1: Sites that run their own LServer and Chord ring | ||
** Tier 2: Sites that manage their own REDDnet depots | ** Tier 2: Sites that manage their own REDDnet depots | ||
** Tier 3: Sites that use their own storage resources as depots | ** Tier 3: Sites that use their own storage resources as depots | ||
** Develop MOU for each tier | ** Tier ?: Sites that supply rack space, and basic infrastructure, but management is by ACCRE | ||
** Develop MOU for each tier - we need to be able to supply reliable storage. | |||
* Needs | |||
** What resources | |||
** What policies | |||
** What management | |||
* Investigate new management tools over the next two months | * Investigate new management tools over the next two months | ||
Line 48: | Line 54: | ||
=== Monitoring === | === Monitoring === | ||
* Use StorCore, Nagios, iperf, and visualization tools from SC07 | * '''Use StorCore, Nagios, iperf, and visualization tools from SC07''' | ||
** Have a statistic page that gathers information from tests and presents them cleanly | ** Have a statistic page that gathers information from tests and presents them cleanly | ||
*** Long term project - 6 months to a year? | *** Long term project - 6 months to a year? | ||
* What is required to provide adequate support for REDDnet | * '''What is required to provide adequate support for REDDnet''' | ||
** Want feedback on this. | ** Want feedback on this. | ||
** Setting expectations? | ** Setting expectations? | ||
Line 62: | Line 68: | ||
** longer term - expected to evolve, integrate with the vis site | ** longer term - expected to evolve, integrate with the vis site | ||
* Create an RT site to resolve users' issues | * '''Create an RT site to resolve users' issues''' | ||
** needs to happen quickly. mid-Feb. | ** needs to happen quickly. mid-Feb. | ||
=== Validation Framework === | === Validation Framework === | ||
* Stress and WAN testing on Production REDDnet | * '''Stress and WAN testing on Production REDDnet''' | ||
** Automated testing with Clyde | ** Automated testing with Clyde | ||
*** excercise system prior to heavy real world use | *** excercise system prior to heavy real world use |
Latest revision as of 10:04, 1 February 2008
Deployment
- Bring current deployment up-to-date (estimate complete by mid-Feb)
- Build new image for 2GB internal USB memory
- may be done by All-Hands
- Design and implement a depot recovery process
- This process will be vetted on current deployed hardware
- Initial process may be done by All Hands or soon thereafter
- Begin with SFASU for initial vetting
- Send recovery keys out to sites and update the depots
- early February
- need to recruit one person at each site to assist
- Set Nagios back up
- need a more stable system before this makes sense
- turned off during this transition period to avoid flood of diagnostics
- needs a day or two of time, could be done now depending on priority
- Build new image for 2GB internal USB memory
- Prepare additional existing hardware for deployment (19 nodes)
- Update image on internal USB (will use for testing of the above recovery process)
- Send 6 depots to SFASU with additional PDU
- Find new collaborators/sites for remaining 13.
- Ideas?
- Develop MOU for current deployment (timescale uncertain?)
- Longer term project
- Define a standard set of software tools for depots
- The following also exist
- Iperf
- Nagios
- mtr
- other tools to be added?
- investigating new tools now
- The following also exist
- Gain experience with existing deployment
- See "Validation Framework" below.
- make frequent reports in weekly REDDnet meetings
- review deployment experience end of March
- Proposed multi-tiered system for sites for discussion
- Tier 1: Sites that run their own LServer and Chord ring
- Tier 2: Sites that manage their own REDDnet depots
- Tier 3: Sites that use their own storage resources as depots
- Tier ?: Sites that supply rack space, and basic infrastructure, but management is by ACCRE
- Develop MOU for each tier - we need to be able to supply reliable storage.
- Needs
- What resources
- What policies
- What management
- Investigate new management tools over the next two months
- rsync or similar (short term)
- Perceus (long term)
Monitoring
- Use StorCore, Nagios, iperf, and visualization tools from SC07
- Have a statistic page that gathers information from tests and presents them cleanly
- Long term project - 6 months to a year?
- Have a statistic page that gathers information from tests and presents them cleanly
- What is required to provide adequate support for REDDnet
- Want feedback on this.
- Setting expectations?
- Actively talk to users over the next couple of months - 6 months - ongoing
- Develop an initial plan by mid-Feb, then review every 3 months and tweak
- Create a REDDnet status site, using google maps
- short term just get green dots on a map (what is the priority for this?)
- longer term - expected to evolve, integrate with the vis site
- Create an RT site to resolve users' issues
- needs to happen quickly. mid-Feb.
Validation Framework
- Stress and WAN testing on Production REDDnet
- Automated testing with Clyde
- excercise system prior to heavy real world use
- unfortunately longer term - first of April?
- this testing will move to test deployment eventually
- Real world use (happening now, although not heavy)
- Automated testing with Clyde
- QA testing on Test REDDnet required before moving into production REDDnet
- A stringent set of tests to test both the hardware, OS, IBP, and LStore as throughly as possible (primarily Clyde)
- Allow users to test using this system