===Notes from the call=== | ===Notes from the call=== | ||
*Bobby Brown | *Bobby Brown reported on the status of deployment work with a rough plan for the future. Discussion of where to site new depots. | ||
**Vandy internal deployment is almost done. 10 test depots, 4 test meta-data servers, 10 depots at ACCRE, 2 meta-data servers | **Vandy internal deployment is almost done. 10 test depots, 4 test meta-data servers, 10 depots at ACCRE, 2 meta-data servers | ||
**REDDnet domain with monitoring software has been established; management node. | **REDDnet domain with monitoring software has been established; management node. [http://monito.reddnet.org/nagious2] More info on the mail list. | ||
**They're working with the VTNA using their campus deployment. | |||
**Other locations for depots: | |||
2 depots are being sent to PR; that would be 6TB; if we need more we can add to that. | ***2 depots are being sent to PR; that would be 6TB; if we need more we can add to that. | ||
***UMich 6TB | |||
In working with the Library of Congress, ACCRE has discovered a bug and he doesn’t know where it sits. Some allocations on resource 0 are disappearing. The standard way IBP has been used is to configure separate disks as separate depots, rather than as one depot with 4 resources. Under the latter configuration, it’s breaking, losing slices. It seems to be some kind of confluence of factors | ***Cal Tech 6TB | ||
***Florida 6TB | |||
Various possible sources of the problem were discussed. | **Where will other depots go? | ||
***Maybe SDSC – Terry and Micah will try to grease the wheels here. | |||
***ORNL is another option. | |||
**Hardware being deployed: | |||
***Tyan motherboard and chasis. Nothing proprietary, though we're getting them through Capricorn. | |||
*** Each 1U unit is 3TB=4 750GB drives | |||
***3 or 4 at UMich cost $2045 per unit=$700 per TB | |||
*In working with the Library of Congress, ACCRE has discovered a bug and he doesn’t know where it sits. Some allocations on resource 0 are disappearing. The standard way IBP has been used is to configure separate disks as separate depots, rather than as one depot with 4 resources. Under the latter configuration, it’s breaking, losing slices. It seems to be some kind of confluence of factors. Various possible sources of the problem were discussed. A major problem is that we haven't found a way to reproduce it yet. | |||
* Alan, Larry, and Hunter reported on the status of the L-Store and StoreCore work at ACCRE/Nevoa | |||
**Storecore is working and fully integrated with L-Store. L-store is now using StoreCore for resource discovering, retrieving an updated list of available depots and their resources. | |||
**Santi got a new version of Nevoa explorer and is working with that. | |||
*Terry raised the question of how were going to get LoRS-view like functionality to | |||
Santi got a new version of Nevoa explorer | |||
L-Store is scheduled to do a release; | L-Store is scheduled to do a release; |
Revision as of 07:11, 16 August 2007
Coordinates
- Time: 10:00EST/9:00CST/7:00PST
- Conference #:510-665-5437 Meeting ID:7333
Attending
- Alan Tackett, Larry Dawson, Santi de Ledesma, Bobby Brown (Vanderbilt ACCRE, in Nashville)
- Dan Engh, Paul Sheldon (Vanderbilt Physics)
- Micah Beck, Terry Moore (UT)
- P.R. Blackwell, Diana Gunter (SFAU)
- ??? (Nevoa, via Skype from Brazil)
Agenda for today's call
Bobby Brown: status of deployment work
- rough plan for the future. Discussion of where to site new depots.
Alan/Larry/Hunter: status of L-Store work at ACCRE/Nevoa
- LoRS/L-Store view
- Nevoa integration
- packaging for install
- testing status
Micah: LoDN Status
Paul: annual report outline and work assignments
Dan: status of CMS work, discussion of possible RHIC task
PR: status/plans
Upcoming Events
- Library of Congress meeting, Sept. 17
- Meeting in San Diego, Oct. 8th.
- Supercomputing 07
All other business
Notes from the call
- Bobby Brown reported on the status of deployment work with a rough plan for the future. Discussion of where to site new depots.
- Vandy internal deployment is almost done. 10 test depots, 4 test meta-data servers, 10 depots at ACCRE, 2 meta-data servers
- REDDnet domain with monitoring software has been established; management node. [1] More info on the mail list.
- They're working with the VTNA using their campus deployment.
- Other locations for depots:
- 2 depots are being sent to PR; that would be 6TB; if we need more we can add to that.
- UMich 6TB
- Cal Tech 6TB
- Florida 6TB
- Where will other depots go?
- Maybe SDSC – Terry and Micah will try to grease the wheels here.
- ORNL is another option.
- Hardware being deployed:
- Tyan motherboard and chasis. Nothing proprietary, though we're getting them through Capricorn.
- Each 1U unit is 3TB=4 750GB drives
- 3 or 4 at UMich cost $2045 per unit=$700 per TB
- In working with the Library of Congress, ACCRE has discovered a bug and he doesn’t know where it sits. Some allocations on resource 0 are disappearing. The standard way IBP has been used is to configure separate disks as separate depots, rather than as one depot with 4 resources. Under the latter configuration, it’s breaking, losing slices. It seems to be some kind of confluence of factors. Various possible sources of the problem were discussed. A major problem is that we haven't found a way to reproduce it yet.
- Alan, Larry, and Hunter reported on the status of the L-Store and StoreCore work at ACCRE/Nevoa
- Storecore is working and fully integrated with L-Store. L-store is now using StoreCore for resource discovering, retrieving an updated list of available depots and their resources.
- Santi got a new version of Nevoa explorer and is working with that.
- Terry raised the question of how were going to get LoRS-view like functionality to
L-Store is scheduled to do a release; There are issues with the GUI that Santi is working with. Discussed L-Store with Brian Burke and he has even/odd code working Aislan: We tested the L-Store client with N-explorer and store core at there site. They discovered some problems and fixed them.
They have a java installer for Nevoa explorer. They plan to make and installer for L-Store.
L-Store will be release .8. There’s no fault tolerance on the Metadata and the security features haven’t been activated. The security feature doesn’t scale at this point and there’s no user interface for it.
What’s the status on LoRS view? The plan is to assign a student intern to it.
b) Nevoa integration c) packaging for install d) testing status
They’re doing nightly builds
Micah talked about his recent missive on DCMA and content control on the depots.